TTP-Engineering downpipes off backorder! IN-STOCK!
I received mine also and very impressed with the quality of this unit. I can't see how you are selling them for what you do. I was thinking about buying a few more since they are so hard to come by. Maybe next batch 
+1 for TTP!

+1 for TTP!
Originally Posted by TTP Engineering
I have a 2005 MR myself and there are no rattles, clears all crossmembers and does not touch. I would retorque the bolts, using the correct hardware in a different order. Once positioned correctly, it fits perfect for a full 3" downpipe.
Thread Starter
Account Disabled
iTrader: (465)
Joined: May 2005
Posts: 8,824
Likes: 2
From: Central FL
Originally Posted by Rnm
Where would you recommend starting with the installation of the downpipe to have the least issues (like starting from the rear to forward where it meets the o2 housing or vice versa)? I won't be putting it in until late next week until my catback arrives, so any tips would be appreciated.
I would try different tq patterns. (i.e.- cat first then DP to O2 or vise versa)
any estimate on time when ull be getting the dp/tp combo? im waiting patiently and have money via paypal just a click away from being sent to u guys. please hurry!
and is 235 still the price for the combo? and does it include shipping costs? thanks!
and is 235 still the price for the combo? and does it include shipping costs? thanks!
Thread Starter
Account Disabled
iTrader: (465)
Joined: May 2005
Posts: 8,824
Likes: 2
From: Central FL
Originally Posted by lznk41
any estimate on time when ull be getting the dp/tp combo? im waiting patiently and have money via paypal just a click away from being sent to u guys. please hurry!
and is 235 still the price for the combo? and does it include shipping costs? thanks! 
and is 235 still the price for the combo? and does it include shipping costs? thanks! 
Originally Posted by TTP Engineering
Yes, those were shipped prices. Trying to get more DP's made. The testpipes are in. I will try to reserve the same pricing for those who are interested prior to the arrival of the shipment. 
Originally Posted by TTP Engineering
Yes, those were shipped prices. Trying to get more DP's made. The testpipes are in. I will try to reserve the same pricing for those who are interested prior to the arrival of the shipment. 
put me down for the dp + tp combo. as soon as the shipment is in and ready to be sent out, you'll have my money via paypal!






