Notices

M7 ebc-r

Thread Tools
 
Search this Thread
 
Old Jan 25, 2012 | 12:10 PM
  #1  
M7 Japan's Avatar
Thread Starter
Former Sponsor
 
Joined: Oct 2011
Posts: 106
Likes: 0
From: Ontario, CA
M7 ebc-r

M7 EBC-R

BOOST CONTROLLER Standard Function

4ch of Duty Variable Control can be set manually. The function can simply be used without other option equipment, with a special selling display PEAK/WARNING/LIMITTER/SCRAMBLE and others.

Wireless Unit Function

Set by a single funtion of 1ch type (Switch is a 1 button type).

For example, it is possible to control through wireless if we want to boost up current running 1.0Hkpa to 1.5Hkpa or decrease to 0.8Hkpa by changing into CH set before the switch is pushed.

Therefore in this case, it is necessary to set CH up or low beforehand but it cannot be raised and lowered at the same time.

In addition, Scramble Switch that is changeable can be used for Boost during the fixed time when turned into ScrambleMode.



http://m7japan.com/m7-product-electronic-m7-ebc-r.html

Don't forget to "LIKE" our Facebook Page!
www.Facebook.com/M7USA

and visit our website!
www.M7JAPAN.COM
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
M7 Japan
Vendor Announcements
1
Apr 2, 2012 07:32 AM
M7 Japan
Vendor Announcements
0
Mar 7, 2012 10:30 AM
M7 Japan
Vendor Announcements
1
Feb 13, 2012 12:40 PM
M7 Japan
Vendor Announcements
0
Jan 24, 2012 10:13 AM




All times are GMT -7. The time now is 05:06 PM.