Croxx2 release
Originally Posted by mhutch
Jamie,
You guys originally had an availability date of Oct 31/Nov 1 and I purchased items based on this information. I have been holding off buying something else waiting on the release of this part because I know you guys offer quality kit
. But... this is just a piece of metal with some folds in it and a cut out in the center.... Will this be supplied in the near future or should I look at other options? IMHO it's not that hard to make but I am willing to pay about what your CroxxI was to not have to deal with finding a fab shop and going it alone. Where does WORKS stand on this item and will it be available soon or should I be looking at other options? 
You guys originally had an availability date of Oct 31/Nov 1 and I purchased items based on this information. I have been holding off buying something else waiting on the release of this part because I know you guys offer quality kit

Originally Posted by mhutch
Jamie,
You guys originally had an availability date of Oct 31/Nov 1 and I purchased items based on this information. I have been holding off buying something else waiting on the release of this part because I know you guys offer quality kit
. But... this is just a piece of metal with some folds in it and a cut out in the center.... Will this be supplied in the near future or should I look at other options? IMHO it's not that hard to make but I am willing to pay about what your CroxxI was to not have to deal with finding a fab shop and going it alone. Where does WORKS stand on this item and will it be available soon or should I be looking at other options? 
You guys originally had an availability date of Oct 31/Nov 1 and I purchased items based on this information. I have been holding off buying something else waiting on the release of this part because I know you guys offer quality kit

Originally Posted by Jamie@WORKS
The WORKS Croxx II is currently under production. The last ETA I heard was towards the end of the year/month. I'm not sure what kind of delays the holdiays may have on this, but I don't see them being delayed much beyond that (if at all).
Thanks for clearing that up.
i was thinking about this over the weekend cause i lost a bolt to the rear most front lower tie, so to get rid of the horrible rattle it was making i took it off.
i also hope the opening works well with my 3" buschur dp since that hits on the old tie bar.
how much is the piece looking to cost?
i also hope the opening works well with my 3" buschur dp since that hits on the old tie bar.
how much is the piece looking to cost?
Originally Posted by tokeone
i was thinking about this over the weekend cause i lost a bolt to the rear most front lower tie, so to get rid of the horrible rattle it was making i took it off.
i also hope the opening works well with my 3" buschur dp since that hits on the old tie bar.
how much is the piece looking to cost?
i also hope the opening works well with my 3" buschur dp since that hits on the old tie bar.
how much is the piece looking to cost?
Just for an update, we recently took 2 Croxx Plate II's, QCed (Quality Control) and made final rev (revision) changes to them so we should be seeing the production run very shortly.
Thank you for your patience but doing it right in the beginning will save a lot of headaches down the road.
WORKS measures twice and cuts once.
Thank you for your patience but doing it right in the beginning will save a lot of headaches down the road.
WORKS measures twice and cuts once.
Originally Posted by EM@WORKS
WORKS measures twice and cuts once. 

I'm sure quality will be top notch.
Originally Posted by slt
More like measure, cut, measure some more, make some more cuts, then measure again to be sure, make some final cuts, measure again to be super sure, then release.
I'm sure quality will be top notch.
I'm sure quality will be top notch.
If we can find anything not perfect... it's not good enough.
Originally Posted by EVIL MR
whats is the croxx plate????????
).



