P2 flashed in 48 hours!
P2 flashed in 48 hours!
On Monday I went home for lunch and pulled the ECU and shipped it. On Wednesday at lunch I installed the newly flashed ECU and wastgate hose. Total down time was only 48 hrs! Pretty impressive turn around time! The hose install takes longer than you would imagine. There must be 50 plastic screws on the splash gaurds and access to the hose end points is pretty tight.
I haven't driven it much but I can definately feel the difference.
I haven't driven it much but I can definately feel the difference.
Originally posted by w2pac12345
The top is really ez. Just pope of the radiator fan. Takes 20 mins. Its 2 bolts and one connector and you can easily get to the hoses.
The top is really ez. Just pope of the radiator fan. Takes 20 mins. Its 2 bolts and one connector and you can easily get to the hoses.


