A full 37r build top to bottom...COMPLETE!
Thread Starter
Evolved Member
iTrader: (27)
Joined: Nov 2003
Posts: 2,123
Likes: 1
From: Oak Creek, WI
Engine is damn near complete. I had him hold of finishing it so I could get some pictures, and here they are:



He just got done with the last rings for file fitting them, cross hatching looks very good as well.


I pick it up this wednesday!!!!!!



He just got done with the last rings for file fitting them, cross hatching looks very good as well.


I pick it up this wednesday!!!!!!
Thread Starter
Evolved Member
iTrader: (27)
Joined: Nov 2003
Posts: 2,123
Likes: 1
From: Oak Creek, WI
Mellon- you have no idea. I talked with him while I was still at work and had a great rest of the day.
Zach- It will still be another month and a half or so. I still need to source a few things. And with this build only being funded by the overtime I work money is tight some weeks. Im not trying to rush this build, if it stretches into next year its fine with me but its been a long time since Ive been to the track.
Zach- It will still be another month and a half or so. I still need to source a few things. And with this build only being funded by the overtime I work money is tight some weeks. Im not trying to rush this build, if it stretches into next year its fine with me but its been a long time since Ive been to the track.
Thread Starter
Evolved Member
iTrader: (27)
Joined: Nov 2003
Posts: 2,123
Likes: 1
From: Oak Creek, WI
Also forgot to add
More things coming in the next few weeks:
AMS fuel system
Weld in 6pt cage
ATS triple Carbon cluth...... saying goodbye to the tilton
More things coming in the next few weeks:
AMS fuel system
Weld in 6pt cage
ATS triple Carbon cluth...... saying goodbye to the tilton
Last edited by dryad001; Aug 11, 2008 at 04:56 PM.
Mellon- you have no idea. I talked with him while I was still at work and had a great rest of the day.
Zach- It will still be another month and a half or so. I still need to source a few things. And with this build only being funded by the overtime I work money is tight some weeks. Im not trying to rush this build, if it stretches into next year its fine with me but its been a long time since Ive been to the track.
Zach- It will still be another month and a half or so. I still need to source a few things. And with this build only being funded by the overtime I work money is tight some weeks. Im not trying to rush this build, if it stretches into next year its fine with me but its been a long time since Ive been to the track.
Thread Starter
Evolved Member
iTrader: (27)
Joined: Nov 2003
Posts: 2,123
Likes: 1
From: Oak Creek, WI
I have a few more on the way. I could have had the engine partially assembled but over the course of the last few weeks I completely forgot to get new gaskets and the local dealers are out of everything.
I was going to go through mitsubishiparts.net (Evom vendor) but they are well over $40 more than mitsubishiparts.com, and some how I dont see a few things is over $40 in shipping.
I have used the 2nd dealer and didnt have a problem from them.
I was going to go through mitsubishiparts.net (Evom vendor) but they are well over $40 more than mitsubishiparts.com, and some how I dont see a few things is over $40 in shipping.
I have used the 2nd dealer and didnt have a problem from them.






