The Rebirth begins....
The Rebirth begins....
Well as most of you know my car has been down since August due to a thrown rod with two nice hole in the block and three in the pan which i just discovered today while me and Chris(Kracka) started the teardown. So far so good hopefully we'll have the engine out and start the teardown on the block to see what evil lies inside! As the project continues I'll clue you in more to the specs of the rebuild but I will say this it will be unique. Thanks again to my good friend Chris who without his help in many ways the project wouldve been sittting along time.
Great progress yesterday! I worked Andrew like a slave 
Removed undertray, drain what little engine oil and coolant remained, removed intake and IC piping, removed the battery and tray, removed the engine harness, removed the fuel rail and associated components, disconnected a bunch of vacuum lines, removed subframe cross members and front engine mount, etc.
I think another few hours of prep work and the longblock will be ready to pull. The next steps will be to remove the front axles and unbolt the transfer case.

Removed undertray, drain what little engine oil and coolant remained, removed intake and IC piping, removed the battery and tray, removed the engine harness, removed the fuel rail and associated components, disconnected a bunch of vacuum lines, removed subframe cross members and front engine mount, etc.
I think another few hours of prep work and the longblock will be ready to pull. The next steps will be to remove the front axles and unbolt the transfer case.
More great progress today, put another ~3 hours into it.
-disassembled the front brakes/hubs
-removed the front axles
-unbolted the A/C compressor
-unbolted the power steering pump
-unbolted the transfer case
The plan for next weekend is to actually get the engine and transmission out of the car.
-disassembled the front brakes/hubs
-removed the front axles
-unbolted the A/C compressor
-unbolted the power steering pump
-unbolted the transfer case
The plan for next weekend is to actually get the engine and transmission out of the car.
Trending Topics
Thanks for the offer, we'll definitely let you know if we need an extra set of hands. Now we're probably in the few weeks of waiting period while all the parts arrive and everything else comes together. Hopefully he can find a trashed transfer case to steal a cover from and the head checks out good.
Thanks for the offer, we'll definitely let you know if we need an extra set of hands. Now we're probably in the few weeks of waiting period while all the parts arrive and everything else comes together. Hopefully he can find a trashed transfer case to steal a cover from and the head checks out good.
He ordered a MAP Stage 2 shortblock, but we'll be doing the head work (installing new valve springs and seals) as long as it's not damaged requiring machining. As for the transfer case, we'll figure out if the internals are damaged once we remove the broken cover.
I know Andrew really wants it to be done by the end of March...we'll definitely see! We've made great progress over the past two weeks. I think the biggest factor now to determining how quickly it's back on the road is wait-time for the engine. MAP has a IX block, I'm not sure if all Andrew's desired internals are in-stock though (I'm sure he'll post the answer).








