MAP Stage 2 LR 2.4L Build
#55
#58
Evolving Member
iTrader: (1)
lol ill do my vc when i can button everything up hence when the can can shows up or once jimmy gets back to us, dont particularly want two open half inch holes there id rather wait for everything to be ready to be buttoned up also have you spoke with paul in reference to whether your vc was blasted or chem stripped?
#59
I hear you brotha.
I did speak with Paul. They do their valve covers on a rig that was made for Evo valve covers. The VC is bolted onto a piece of cast with a gasket underneath to ensure that no sand gets up in there. So, I should be gravy.
They came up with that idea when Paul lost a motor because he had sand in his baffles..........
I did speak with Paul. They do their valve covers on a rig that was made for Evo valve covers. The VC is bolted onto a piece of cast with a gasket underneath to ensure that no sand gets up in there. So, I should be gravy.
They came up with that idea when Paul lost a motor because he had sand in his baffles..........
#60
Evolving Member
iTrader: (1)
ps wifeys coming back with me this weekend so i wont be super available lol so if you start assembling your long block at least get timing components done and such up to about when your ready to put your head on and ill come over to help you from there and do your timing belt/tensioning etc
The following users liked this post:
japspec (Jan 23, 2019)