Custom 16G6 Turbo Project
yup, so I think I might just get that, this save me about 50 bucks from buying a mirage/lancer obx header.
btw, the guy who IM me will be using that set up for his custom turbo.
btw, the guy who IM me will be using that set up for his custom turbo.
Last edited by AznFlip; Jun 5, 2005 at 10:08 PM.
Updates:
I just bought oil line kit from cheapturbolines.com. I'll be buying a custom mild-steel flange this coming Thursday or Friday. Hopefully I can start the install next week. I just need to order boost and egt gauges and 5lbs wastegate spring.
I just bought oil line kit from cheapturbolines.com. I'll be buying a custom mild-steel flange this coming Thursday or Friday. Hopefully I can start the install next week. I just need to order boost and egt gauges and 5lbs wastegate spring.
Last edited by AznFlip; Jun 13, 2005 at 05:21 PM.
Originally Posted by Hotshot940
i have a 5 psi wastegate spring if you want to buy mine.
Well it have to be from Forge, because the spring look something like this... / \ . I assumed you have Tial spring right.
Updates:
I just bought 5-10 psi green spring from Forge, costed me 23 bucks (what a relief for me) . I just need to work my damn turbo manifold and wait to recieve my oil line kit and just buy misc. stuff and I am ready to go! Hopefully I can start the install by 1st week of July.
I just bought 5-10 psi green spring from Forge, costed me 23 bucks (what a relief for me) . I just need to work my damn turbo manifold and wait to recieve my oil line kit and just buy misc. stuff and I am ready to go! Hopefully I can start the install by 1st week of July.
Last edited by AznFlip; Jun 20, 2005 at 12:36 PM.
Originally Posted by HobieKopek
Good luck. Hope it all goes well.
EDIT: How are you controlling fuel?
EDIT: How are you controlling fuel?

The car will be faster once boosted, but run like crap w/ the vortec and nothing else. You need to get an SAFC as well and a wideband to see what is going on and adjust accordingly. You need to do some learning on the fuel issue before you blow up your project that you have worked so long for.



