"Project Hard Park"
#271
Preparing for "phase 2"
Drove and picked up Trans and LSD from Jon. Also received the Evo 6 Koyo my wife ordered me for my bday.
Still have not sent pan to Racefab. I am compiling a list of things I need to get trans, radiator(while deleting AC), and LSD in. Bushings and such.
The trans ended up having a bad 1st gear and input shaft. So after getting new ones, the only not new piece is 2nd gear itself.
Stage 3 with OE final-drive and fluid-cooler adapter plate/4th gear cooler.
Gears:
1 - 2 Evo 9
3 - 4 Evo 8
5th JDM .825:1
Before:
After:
Drove and picked up Trans and LSD from Jon. Also received the Evo 6 Koyo my wife ordered me for my bday.
Still have not sent pan to Racefab. I am compiling a list of things I need to get trans, radiator(while deleting AC), and LSD in. Bushings and such.
The trans ended up having a bad 1st gear and input shaft. So after getting new ones, the only not new piece is 2nd gear itself.
Stage 3 with OE final-drive and fluid-cooler adapter plate/4th gear cooler.
Gears:
1 - 2 Evo 9
3 - 4 Evo 8
5th JDM .825:1
Before:
After:
Last edited by V.8MR; Nov 12, 2016 at 05:55 PM.
#272
LSD is a 1 way Max-lock 12 plate with all the bells and whistles.
EVO 6 Koyo still in the box:
He gave me back the input shaft and 1st gear. They were already Shot Peened and Isotropic Super Finished before he determined they were bad. 1st gear is a pretty cool paper weight haha
EVO 6 Koyo still in the box:
He gave me back the input shaft and 1st gear. They were already Shot Peened and Isotropic Super Finished before he determined they were bad. 1st gear is a pretty cool paper weight haha
Last edited by V.8MR; Apr 15, 2017 at 05:03 PM.
#273
EvoM Guru
iTrader: (1)
Glad you finally got it handled with TRE. You won't be disappointed.
#279
Thanks guys. No I don't have Instagram though sorry. It just started getting cold here so progress will be minimal. At least until I get a decent gas or elec heater in the garage. Brought my wheels/tires into my office. Going to be too cold to leave NT01s in there. Wife was not pleased haha.
The following users liked this post:
NJ9MR (May 17, 2017)
#283
EvoM Guru
iTrader: (1)
What was turn around on the pan?
#284
About 1 week shipping via USPS, 3 days to perform work at Racefab, then about 3 days return DHL shipping. It was longer for me though, because for whatever reason Rob was not accepting paypal. Had to do wire transfer from my bank. Also cost me an additional $50 for the transfer...
Last edited by V.8MR; Dec 15, 2016 at 04:59 PM.